Construction Stage Services Costs
Construction stage services cost more if the design is still being done when construction begins.
Target all the design to be done before construction begins.
If that is not possible, try to have complete deliverables packages complete before construction begins.
If design is still proceeding when construction starts, the constructors will require a lot more input from the designers, leading to higher design costs (in construction stage services).
Related Posts
- Design Discrepancies
- Document Design Changes and Delays
- Consider Overall Costs
- Order More than Required
- Eliminate Unnecessary Features
Tagged with: construction stage services • deliverables • work packages
Filed under: Construction • Cost • Design • Planning
Like this post? Subscribe to my RSS feed and get loads more!

Leave a Reply