If you have control of the system at the start of a project, make sure the project (or even at the program level, project office level, or company level) uses a document and accounting system that can record and output everything.

This would include costs, labour, forecasts, statistics, billing, budget, expenses, changes etc.

It should be able to output things like:

  • Weekly reports.
  • Monthly cost summary
  • Invoices
  • Labour costs for a period
  • Expense breakdowns
  • Cost to date
  • Variance
  • Total cost at completion

This should all be available from one package or a number of modules that are automatically linked together. You do not want to have multiple spreadsheets that people record things in that are not linked. The result should be a significant reduction in paperwork.

Certain inputs could only be allowed by certain people (by log in), such as:

  • Accounts (accountant)
  • Billing
  • Labour (site manager)
  • Design hours (design manager)

Individual hours by each person could be input (linked) from time sheets. All staff/employees should have adequate training so that the system is used properly

To start with, I recommend looking at the list of project management software at Wikipedia.

Related Posts

  1. Document Design Changes and Delays
  2. Eliminate Unnecessary Features
  3. Record Your Achievements
  4. Simple Document System
  5. Submit claims as soon as possible

Tagged with:

Filed under: CostDocumentationPlanning

Like this post? Subscribe to my RSS feed and get loads more!